Well after a couple of days in the digger I now have an almost complete pathway through the reserve, just about 20 metres of floating boardwalk over the water to make it complete.
I did disturb a little resident but thankfully he wasn’t hurt, just a little confused:
John and I are continuing to build our storage shed, it’s not looking too shabby.